To change the destination vessel:
- Edit the work order.
- Edit the job.
- Select the Schedule Details tab.
- Click the to view the vessel’s schedule and any jobs associated with it.
- From the Equipment Schedule window, use the View By list to view the schedule for the vessels you’re interested in.
- Click Use beside the destination vessel.
The Schedule Details and General tabs reflect the vessel that you selected.